Bathrooms · Central Coast, Newcastle, Hunter
For bathroom renovations on the Central Coast, we strip the room back to its frame, fix what years of water have done, and rebuild it layer by layer with licensed waterproofing under every tile. Vincent runs the building trades and Clarence handles the fan, lighting and heated rails, all on one itemised quote.
Master Builders NSWMemberWhy we strip it back
Because the parts that fail are hidden. A shower that has leaked slowly for years can leave soft timber, rusted fixings and mould behind tiles that still look fine. Tiling over the top hides the problem for a while; stripping back lets us fix it and start the new room on a sound, dry base.
Plenty of Coast bathrooms date from the 1960s to the 1980s, and many have been patched more than once. When the old tiles and sheeting come off, we regularly find bottom plates darkened by water, joists softened under the shower, and wiring for the light and fan that was never meant to sit near a wet wall.
Older bathrooms also carry an asbestos risk. Fibre cement sheeting behind tiles, and some old vinyl floors, can contain it. We have suspect material sampled before demolition, and anything that tests positive is removed by a licensed removalist under the SafeWork NSW asbestos rules before our trades start.
Once the room is open, everything you will never see again gets attention: rotten timber replaced, noggins added for the vanity, towel rails and shower screen, and new plumbing and cable run where the final layout needs them.
Frame exposed, services roughed in before sheeting
Inside a bathroom floor
A tiled floor is five layers, built in order from the bottom up. Select a layer in the cutaway to see what goes into it, what we check and what goes wrong when it is skipped.
On a raised timber floor this is the joists and bearers; in a newer house it is the concrete slab. We check it for rot, termite damage and level before anything else, because a floor that flexes will crack grout and tear a membrane no matter how good the tiler is.
If it is skipped: movement in a soft floor shows up as cracked tiles and leaks within a few years, and the whole room comes out again.
Walls are lined with sheeting rated for wet areas, and a timber floor gets a fibre cement floor sheet that stays stiff under tiles. Each board is fixed at the spacing its maker requires, with joints treated so the layers above have a flat, sound surface.
If it is skipped: the wrong board softens with moisture, and tiles start to drum or lift from the wall.
Tiles and grout are not waterproof; the membrane is. It is applied by a licensed waterproofer, with flexible bond breakers where walls meet the floor, reinforced corners and a sealed flange at every floor waste. The Australian Standard for internal wet areas, AS 3740, sets out where it must go and how far up the walls.
If it is skipped: water tracks into the frame and the room below, and the first sign is often a stain on a ceiling or a skirting that will not stay painted.
A sand and cement bed is laid so the floor falls toward the waste. With a centre waste the fall runs in from every side; with a linear strip drain it runs one way, which lets you use larger tiles. Getting this right is the difference between a shower that drains and one that leaves a puddle.
If it is skipped: water sits in corners, grout stains and mould follow, and the fix means lifting the floor.
Tiles are fixed with an adhesive suited to wet areas, grouted, and finished with flexible silicone at every internal corner and change of plane, where grout would crack. We check flatness and lippage against the NSW Government guide to standards and tolerances before the room is handed over.
If it is skipped: cracked grout in corners lets water behind the tiles, which is how a sound membrane gets tested far harder than it should.
Walls follow the same logic with one layer fewer: frame, wet-area sheet, membrane where the standard calls for it, then adhesive and tile. Inside the shower the membrane covers the walls as well as the floor; outside it, the floor is waterproofed and turned up at the wall junctions. Before the sheeting is closed in, we walk you through the room and point out where each layer starts and stops, so you know exactly what sits behind the finished tiles.
Waterproofing checklist
You cannot see a membrane once the tiles are down, so ask for evidence while you still can. These are the checks we build into every wet area, and the ones worth asking any bathroom builder about.
| Check | Why it matters | When to ask |
|---|---|---|
| A licensed waterproofer is named | Waterproofing is licensed trade work in NSW, and the person applying it should hold the right licence | At quote stage |
| The product and system are written down | Each membrane has its own primer, thickness and cure rules; mixing systems voids the maker's guidance | At quote stage |
| Bond breakers at every junction | Walls and floors move slightly; a flexible joint stops the membrane tearing at the corners | Before the membrane goes on |
| Sealed flange at each floor waste | The waste is where water collects, so it is where a poor seal leaks first | Before the membrane goes on |
| Waterstop at the shower or doorway | Stops water on the floor travelling under the tiles into the next room | Before screeding |
| Cure time respected | A membrane covered too early can stay soft or blister under the screed | Before tiling |
| Photos of the finished membrane | The only record of the layer that matters most, once it is hidden for good | Before tiling |
| Written certificate at the end | States who did the work and to which standard, useful if you ever sell or claim | At handover |
Licensing details for waterproofers are on the NSW Government's waterproofing work page, and the guide to standards and tolerances explains what counts as an acceptable tiled finish. A bathroom job over $5,000 also needs a written contract, and above $20,000 you should hold the home building compensation insurance certificate before any money changes hands.
Design decisions
Some upgrades change only the price of the fitting. Others change the frame, the falls or the plumbing. Here is what each popular choice really involves.
No step into the shower looks clean and suits ageing in place, but the floor has to be set down or built up so water still drains away. A linear drain along one wall usually makes it work.
Families with young children usually want one, and a bath can matter when you sell. In a small room, a shower over a bath or a compact freestanding tub can keep both without losing floor space.
A floating vanity makes a small room feel larger and is easier to mop under. It needs solid noggins in the wall and plumbing set at the right height, both done while the frame is open.
A niche keeps bottles off the floor. It has to sit between studs, be fully waterproofed inside and slope slightly so water runs out, so its position is fixed at the framing stage.
Hiding the cistern inside the wall saves space and looks tidy. The frame needs a deeper section or a false wall, and an access panel stays so the valves can be serviced later.
Big tiles mean fewer grout lines but demand a flatter floor and wall. On a floor they work best with a one-way fall to a linear drain rather than four falls to a centre waste.
Two problems we see again and again on the Coast are mould on the ceiling and showers that are hard to use as people get older. Both are cheapest to solve during the renovation. A ducted fan, a window that actually opens and a ceiling paint made for wet areas deal with the first. Blocking in the walls for grab rails, choosing a hobless shower and setting the vanity at a comfortable height deal with the second, even if the rails themselves never go up.
Bathroom electrical
Water and electricity share the room, so the wiring rules are strict. Clarence plans every fitting with you before the sheeting goes on.
New circuits in the bathroom are protected by safety switches, and Clarence tests each one before handover.
The wiring standard limits where outlets, switches and lights can go around a bath or shower, so positions are set out on the frame.
A fan that vents into the roof space just moves the damp. We duct it outside, often with a run-on timer, which is the best defence against mould.
Heated towel rails, backlit mirrors and underfloor heating need power points or hard-wired connections placed before the walls are closed.
If the bathroom work shows that the rest of the house needs attention, Clarence covers safety switches and rewiring on our home electrical services page. We also like separate switches for the fan, the main light and a soft night light, which saves walking into a glaring room in the middle of the night.
Finished bathrooms
Every photo here was taken on one of our own jobs, and each room has its own finish, fittings and layout.



Very knowledgeable, extremely thorough, more than happy to answer any questions, did an amazing job, and left the site spotless, very respectful
The Wallsend and Merewether Heights rooms are both on our projects page, alongside bathrooms we have rebuilt as far inland as Warren in central NSW. Our process is the same every time: old tiles off, the frame checked and the services renewed before a single new tile goes on. If the bathroom is one part of a bigger plan, see how we stage several rooms together on our whole-home renovations page.
FAQ
Short answers on cost, time, leaks and living without a shower.
It is sometimes possible, but we rarely recommend it. You cannot check or renew the membrane underneath, the floor rises, and any leak that already exists is simply covered up. The extra thickness can also cause problems at the door, the floor waste and the shower screen.
Common signs are grout that keeps cracking or darkening, tiles that sound hollow, skirting or paint swelling outside the shower, a musty smell, and stains on the ceiling or subfloor below. We can check with a moisture meter at the quote visit and tell you honestly whether a repair will hold or the room needs rebuilding.
It depends on the size of the room, what we find behind the tiles and the cure times of the waterproofing and screed. Your written program shows the dates, and we help arrange a temporary option if it is your only bathroom.
A like-for-like renovation inside the existing room normally does not. Moving walls, changing the floor area or altering structure can need a CDC or DA, which we confirm before quoting. In a strata unit, work involving waterproofing usually needs owners corporation approval first.
A licensed waterproofer applies the membrane as part of our program. We inspect and photograph it before the screed and tiles go on, and the certificate comes to you at handover.
Usually, yes. On a timber floor it is often straightforward from underneath; on a slab it means cutting the concrete for new drainage. Either way, it is priced clearly as its own line, so you can decide whether the better layout is worth the extra plumbing.
Under NSW law, residential building work carries a six-year warranty for major defects and a two-year warranty for everything else, and waterproofing failures are taken seriously under both.
We can, or you can choose your own. Anything not yet picked appears as an allowance in the quote, so you can see the effect of your choices on the total. We also check that what you pick suits the room, such as a mixer that fits the wall depth or a tile rated for wet floors.
More renovation services
Bathrooms are often the start. Each page below covers another of our renovation services.
Looking at the bigger renovation picture?Go to the renovations section
Start your bathroom
Send a couple of photos of the room and anything that worries you, from cracked grout to a stain on the ceiling below. Vincent will check it with a moisture meter and send an itemised price with the electrical already counted.