• Mon to Fri, 7am to 4pm
  • NSW Builder Licence 329 075C
  • Central Coast · Newcastle · Hunter

Decks · Pergolas · Pool surrounds

Deck Builders on the Central Coast, With the Wiring Built In

As licensed deck builders on the Central Coast, we design, frame and finish hardwood, treated pine and composite decks, from low platforms off the kitchen to raised decks on steep lake blocks. Vincent builds under licence 329 075C, and Clarence wires the lights, fans and outdoor power before the boards go down.

  • Footings to finished boards
  • Outdoor lighting by our electrician
  • Approval path checked first
Long hardwood deck beside a lake with moored boats, built by Belvedere, deck builders for the Central Coast and Lake Macquarie
Hardwood deck, Sunshine Parade
Built into every deck
  • Footings sized to the soil and the load
  • Flashing where the deck meets the house
  • Stainless or galvanised fixings near salt
  • Barriers wherever the fall reaches 1 m
  • Licence 329 075CNSW builder, look it up
  • Licensed electricianClarence, for outdoor power
  • Master Builders NSWMember
  • 5-star on Google17 reviews
  • ABN 60 627 857 145Registered NSW business

Deck types

What kind of deck suits your block and the way you live?

Choose the deck closest to what you have in mind. Each shows the usual height, the approval question and likely materials, with a link to its own page.

Type A

Ground-level decks: the low platform that gets used daily

A deck that steps straight out from the family room at floor height is the most common job we quote. Being close to the ground, the hard part is airflow: boards and joists need clearance and cross ventilation underneath, or they stay damp through a Coast winter and start to cup.

Typical height

Under 1 m, often a single step down

Approval

Frequently exempt if every standard is met

Common boards

Hardwood, or composite on a closer joist grid

Timber species and oiling guide
Type B

Raised decks: engineering first, boards last

Lake and escarpment blocks around the Coast often fall away steeply behind the house, so the deck becomes the only flat ground you have. Raised decks need engineered footings, braced posts and a barrier along every open edge. On bare rock, steel posts drilled and pinned into the stone often replace dug footings. Our Sunshine Parade job paired a hardwood deck with a steel walkway over rock.

Typical height

Over 1 m at the outer edge

Approval

Generally a CDC or a council DA

Common frame

Steel posts, timber or steel bearers

See the Sunshine Parade job
Type C

Pool surrounds: grip, drainage and the fence line

Around a pool, the deck has to stay safe underfoot when wet and shrug off splashed water every day of summer. The board choice leans toward dense hardwood with a textured face or a composite rated for wet areas. The deck also cannot weaken the pool barrier, so we plan the fence posts, gates and any climbable edges with the deck framing.

Typical height

Flush with the coping or a step down

Approval

Tied up with the pool barrier rules

Common boards

Textured hardwood, wet-rated composite

Pool deck design notes
Type D

Alfresco decks: plan the kitchen before the frame

If the deck is where you cook and host, the gas line, sink waste, power for a fridge and the barbecue's clearances all affect where joists and bearers go. Clarence places weatherproof outlets and lighting circuits to suit the layout before the boards close everything in.

Typical height

Floor level with the living area

Approval

Often linked to a roof over the deck

Services

Power, lighting, gas and water planned in

Alfresco deck planning
Type E

Roofed decks: a second living room outside

Add a gable, skillion or insulated panel roof and the deck becomes usable through summer storms and the hottest afternoons. A roof changes the approval picture, because the structure gains height and the roof water needs somewhere legal to go. It also gives Clarence a ceiling to fit downlights and a fan.

Typical height

Roof ridge often above 3 m

Approval

Usually CDC or DA once roofed

Extras

Fans, downlights, guttering to stormwater

Deck and pergola roof options
Type F

Rebuilds: what is under the boards decides the price

A tired deck with grey, splitting boards may only need new decking on a sound frame. A deck that bounces, leans or has soft joists near the house usually needs the subframe rebuilt as well, especially where the ledger was never flashed and water has run into the wall. We lift a few boards and probe the timber before we give you a figure.

First step

Inspect bearers, joists and fixings

Approval

Like-for-like repairs often need none

Common outcome

Reboard on the frame, or a full rebuild

Repair or replace an old deck

Who does what

What should a Central Coast deck builder handle for you?

Quick answer

Everything from the approval question to the final screw: site levels, footings, the frame, flashing to the house, boards, stairs, barriers and the paperwork. With an electrician in the business, outdoor lighting and power are part of the same job rather than a second trade you chase afterwards.

Most deck problems we are called to fix started out of sight. Footings that were too shallow for sandy coastal soil, joists spaced for one board and fitted with another, a ledger bolted to the house with no flashing above it, or fixings that rusted within a few summers of salt spray.

So our quotes describe the hidden parts as carefully as the finish: footing type and depth, post and bearer sizes, joist spacing, the treatment level of the framing timber and the fixings we will use.

Our decks stretch from Long Jetty and Bateau Bay to the waterfront suburbs around Brisbane Water and Lake Macquarie. The roofed deck in the photo, at Fishermans Parade, Daleys Point, came as part of a kitchen and living rebuild. More finished decks sit on our projects page.

Covered deck under a new gable roof at Daleys Point, with a steel balustrade and the water beyond at sunset Gable-roofed deck, Daleys Point

Board choice

Hardwood, treated pine or composite: which decking holds up best here?

Each material has a place on the Coast. Sun, salt, bushfire mapping and your appetite for upkeep decide which one fits.

General comparison of the three common decking materials. Product data and the site's BAL rating confirm the final choice.
QuestionHardwood boardsTreated pine boardsComposite boards
LookNatural grain and colour that varies board to boardPale, even timber that takes stain wellUniform colour and texture, timber-look or plain
UpkeepClean and re-oil regularly to hold the colour, or let it weather silverRegular coating to slow splitting and movementWash down; no oiling or sanding
Underfoot in summer sunWarm but bearableWarm but bearableCan get noticeably hotter, darker colours most
Tannin and stainingSome species bleed tannin onto paving at firstMinimalNone from the board itself
Bushfire mapped blocksCertain dense species suit higher BAL ratingsLimited to lower ratingsDepends on the product's fire testing
Frame it needsStandard joist spacing for the board sizeStandard joist spacing, closer for thin boardsOften closer joists and set expansion gaps
Repairs laterSand back and re-oil, replace single boardsReplace boards as they splitReplace boards; scratches cannot be sanded out
Where we use it mostFeature decks, pool decks, bushfire sitesSubframes, budget platforms, painted decksLow-upkeep decks, holiday homes, rentals

For species, grades and an oiling calendar, read our hardwood and pine guide. For heat, subframe and expansion notes on boards made from wood fibre and plastic, see the composite comparison.

Approval check

Can your deck be built without council approval?

Quick answer

Possibly. In NSW a small, low deck can be exempt development if it meets every standard at once: floor no more than 1 m above existing ground, no more than 25 m², behind the building line, set back from boundaries and no more than 3 m high overall. Miss one and it needs a CDC or a DA.

Is the deck floor 1 m or less above existing ground?Measured from the ground as it is now, not after fill.

Is it 25 m² or smaller, within the lot's total limit?All such structures together: 25 m² on lots to 300 m², or 15% of the home's ground floor on bigger lots.

Does it sit behind the building line of every road frontage?Corner lots have two frontages.

Is it at least 900 mm from each side and rear boundary?The setback becomes 5 m in rural zones RU1 to RU4, RU6 and R5.

Is its highest point 3 m or less above ground?Include any roof, posts or privacy screen.

Is the block bushfire prone, with the deck within 5 m of the house?Check your council's bush fire prone land map.

Your result

Answer the six questions

Each answer updates the result. It is a guide to the state standards, not a ruling on your land, and we confirm the pathway on site before any quote is final.

    Standards summarised from the NSW Planning Portal page on exempt balconies, decks and patios, which also requires low-reflective, factory pre-coloured metal parts, an enclosing wall no higher than 1.4 m, and structures that are sound and comply with the building code. Heritage items and State Heritage Register land sit outside the exempt route, as explained in the portal's exempt development overview.

    Balustrades

    When does a deck need a balustrade, and how high must it be?

    The National Construction Code sets four numbers that shape almost every raised deck we build. They apply whether or not the deck needed approval.

    1 m fall

    Barrier required

    Once someone could fall 1 m or more from the deck surface to the ground below, the open edges need a barrier. On a sloping block the outer edge often crosses that line even when the house end does not.

    1 m high

    Minimum height

    The barrier on a deck or balcony must stand at least 1 m above the finished floor, measured from the boards, not from a planter or bench beside it.

    125 mm

    Largest gap

    No opening in the balustrade may let a 125 mm sphere through, which rules out wide gaps between balusters or under the bottom rail.

    4 m fall

    No climbable rails

    Above a 4 m drop, horizontal parts between 150 mm and 760 mm above the floor must not help a child climb, so horizontal wire and rail designs are out.

    Figures from Part 11.3 of the ABCB Housing Provisions, barriers and handrails.

    On site

    How does a new deck come together from bare ground?

    Six stages, in this order, on almost every deck we build. The electrical rough-in sits in the middle on purpose.

    1. 01

      Levels and set-out

      We mark the outline, take levels off the door sill and confirm boundary setbacks against the survey or fence line.

    2. 02

      Footings

      Pier holes or screw piles go in to the depth the soil and the engineer require, with post stirrups set clear of the ground.

    3. 03

      Subframe

      Bearers and joists are fixed and braced, the ledger flashed to the house, and the frame checked for level and twist.

    4. 04

      Cables run

      Clarence runs conduit for step lights, outlets and any roof circuits while the joists are still open.

    5. 05

      Boards and stairs

      Decking goes down with even gaps and hidden or stainless fixings, then the stairs and nosings are built.

    6. 06

      Barriers and sign-off

      Balustrades are fitted, lights tested, and you receive the electrical compliance certificate with the handover notes.

    Local conditions

    Why do Central Coast decks fail, and how do we build against it?

    Six local conditions explain most of the early failures that deck builders on the Central Coast get called back to fix.

    Beach and lake streets

    Salt in the air

    Plain zinc screws and brackets corrode fast within reach of sea spray. Close to the water we specify stainless fixings and heavier galvanised connectors, and keep dissimilar metals apart.

    Bushland edges

    Termites

    Subterranean termites are active across the region. Posts sit on stirrups clear of the soil, framing is treated to suit its exposure, and we leave room to inspect underneath.

    Escarpment and lake blocks

    Steep and rocky ground

    Falls of several metres are common behind waterfront houses on Brisbane Water and the lake. We pin steel posts into rock and design bracing for the height rather than relying on long timber posts.

    Mapped bushfire land

    BAL ratings

    On bushfire prone land the site's attack level controls which boards, subframe and gaps are allowed. The NSW Rural Fire Service sets out how building in these areas works, and we confirm the rating before choosing timber.

    Clay and sandy soils

    Water under the deck

    Roof runoff that pools under a low deck keeps the frame wet. We grade the ground, add drainage where water collects and leave enough height for air to move through.

    Every attached deck

    The join to the house

    Where a ledger is fixed to the wall, a flashing over it keeps rain out of the frame and the cladding. Missing flashing here is one of the most common causes of rot in older decks.

    Our decks

    What do our decks look like during the build and once finished?

    Frames matter as much as finishes, so here are both. All four photos come from our own jobs.

    White home with a gable roof over a timber deck, lit ceiling and wide steps down to the lawn at Long Jetty
    Oaks Avenue, Long JettyGable deck on a new home
    Timber deck subframe of bearers and joists stepping down a sloping lakefront block at Sunshine
    Sunshine Parade, SunshineSubframe on a falling block
    Gable pergola with exposed timber bracing over a red-toned hardwood deck behind a brick home
    Hardwood deck and gable roofOutdoor room off the living area
    Large deck joist grid laid out under new roof rafters and steel posts in a backyard
    Frame stageJoists set out under the new roof

    One team outside

    Why have the electrician on the deck job from day one?

    Outdoor electrical work is easiest while the frame is open. Cable for step lights and garden lighting can run along the joists in conduit, outlets can sit where the barbecue and heater will actually go, and a fan or downlights in a deck roof can be wired before the ceiling lining closes it up.

    When the builder and the electrician are separate businesses, that window is easy to miss. The deck gets finished, the electrician arrives later, and cables end up surface-mounted or the boards come up again. With Clarence in the business, his rough-in is booked into the program between the subframe and the boards.

    New outdoor circuits are protected by 30 mA safety switches and use fittings rated for the weather they will see. Once it tests clean, Clarence issues a CCEW for the deck circuits and sends it to Building Commission NSW, as the state's electrical compliance rules require. For bigger electrical upgrades, our electrical services cover switchboards and more.

    Contract basics

    What protects you on a deck job

    • Written contract for any deck over $5,000, deposit capped at 10%
    • Home building compensation cover once the job exceeds $20,000
    • Six years of statutory warranty for major defects, two for others
    • A builder licence you can check before signing

    Deck work counts as residential building work, so ask for the paperwork before any footing is dug.

    Deck and gable pergola at Sabrina Avenue
    Clarence and Vincent completed our back deck including electrical work.They were very efficient and had high attention to detail. They were great to work with and I highly recommend this company.
    Pammy, Google review

    FAQ

    What do people ask deck builders before they book?

    Straight replies to what most owners raise when we measure up a deck.

    Do I need council approval for a new deck?

    Only if it falls outside the exempt standards. A low, small deck behind the building line and clear of the boundaries can often go ahead without approval. Larger, higher or roofed decks usually go through a complying development certificate from a private certifier, or a development application to council.

    At what height does a deck need a balustrade?

    Wherever the drop from the deck surface to the ground beneath reaches 1 m or more. The barrier must be at least 1 m high above the deck floor, and gaps in it must stop a 125 mm sphere passing through.

    Which decking is best near the beach?

    The board matters less than the fixings. Dense hardwood and good composite both cope with salt air, but plain steel screws and brackets do not. Close to the water we use stainless fixings and keep the frame ventilated so salt and moisture can dry off.

    Can you build a deck on a steep or rocky block?

    Yes. Steep sites are routine for us around the lake and the escarpment. We use engineered footings or steel posts pinned into rock, and the design accounts for the full height and the barrier rules on every open edge.

    Does a deck job need a written contract?

    Yes, once the work is worth more than $5,000, and the deposit cannot exceed 10%. Above $20,000 you also receive a home building compensation certificate before any work starts or money changes hands, as set out in the NSW contract rules.

    Can you add lights, fans and power points to my deck?

    Yes, and it is cheaper before the boards go down. Clarence plans weatherproof outlets, step and wall lights, and fan or downlight circuits for a deck roof, all on safety switches and certified when finished.

    Is a deck possible on bushfire prone land?

    Yes, built to the site's bushfire attack level. The rating sets the allowed boards, subframe and detailing. For an exempt deck within 5 m of the house on mapped land, the materials must be non-combustible.

    Should I repair my old deck or start again?

    If the bearers, joists and footings are sound, new boards and rails may be all it needs. Soft joists near the house, rusted fixings or a deck that moves underfoot point to a rebuild. We inspect first and quote both options where both are realistic.

    Deck and pool services

    Which deck service should you read next?

    Six pages, each focused on one material, deck type or job, with its own approval notes and common questions.

    Want a house build or extension alongside the deck?See what else we build

    Plan your deck

    Ready to get a price on your new deck?

    Send a photo of the area, rough measurements and whether you want a roof over it. Vincent will visit, check the levels and the approval route, and send an itemised quote that already includes Clarence's lighting and power.