A Level 2 electrician on the Central Coast works for an Accredited Service Provider on the link between Ausgrid's network and your home: the service line, disconnection, reconnection and energising supply. Belvedere is not an ASP. Clarence does the licensed wiring and board work, and we book the accredited Level 2 provider inside the same job.

Master Builders NSWMemberLevel 2 explained
A Level 2 electrician works for an Accredited Service Provider (ASP) and is authorised by Ausgrid to work on the supply side: the service line and the network devices at your main switchboard. A licensed electrician handles everything past that point. Most supply upgrades need both on the same day.
The electricity network does not stop at the pole in your street. It runs along the service line, through the service fuse or service protection device on your meter panel, and only then becomes your own installation. The NSW Government decides who may touch that first stretch through the Accredited Service Provider scheme. Its Level 2 accreditation covers building or changing service lines between the network and the point of connection, energising new or altered connections, and work on customer-owned network devices such as the service protection device, as the ASP scheme page explains.
Here is how the work splits. Clarence Quin holds a NSW electrical licence and does the work on your side of the connection point. When a job reaches past that point, it is done under Level 2 accreditation, and we organise that part for you, fit the visit into our program and show it as its own line in your quote, so you deal with one business rather than three.
The split matters most on switchboard replacements, supply upgrades and new homes, where power has to be isolated at the service fuse before anyone can safely work on the board.
An older meter panel with rewireable fuses and off-peak hot water
Who does what
Up to six parties can have a hand in the power to one house. Here is where each one's work starts and stops, and who to ring for what.
| Who | What they are allowed to do | Typical home jobs | Who books them |
|---|---|---|---|
| Licensed electricianClarence, Belvedere | Wiring, circuits, switchboards, safety switches, lights and power points, testing, and lodging the compliance certificate | Rewires, board replacements, new circuits for EV chargers or induction | You, through us |
| Level 2 ASPAccredited Service Provider | Service lines overhead or underground, disconnecting and reconnecting supply, energising connections, the service protection device | Isolating a board for an upgrade, overhead to underground, supply upgrades | We arrange it inside your job |
| Level 1 ASPNetwork construction | Builds or extends network assets: poles, street wires, underground mains and substations | Subdivisions, new street supply, moving a pole | The developer or owner, with Ausgrid |
| Level 3 ASPNetwork design | Designs the network assets that Level 1 providers build | Larger developments and relocations | Usually the Level 1 provider |
| Metering providerAppointed by your retailer | Installs, replaces and tests smart meters | New meter after an upgrade or solar, faulty meters | Your electricity retailer |
| AusgridNetwork distributor | Owns and runs the poles and wires, authorises ASP workers, looks after its older meters | Outages, network faults, fallen wires | Anyone, on 13 13 88 |
Sources: NSW Government pages on the three ASP levels and on changing the supply to your property, plus Ausgrid's notes on who is responsible for meters.
Keep everyone well clear, do not touch anything the line is resting on, and call emergency services before anything else.
000Faults on the poles and wires belong to Ausgrid. Report them to the distributor directly, day or night.
13 13 88Meters are your retailer's responsibility. Use the number on your bill and quote the meter number printed on it.
Your retailerWe price the licensed work, line up the accredited provider and handle the paperwork so the sequence holds together.
0435 726 524Common triggers
Six situations account for most of the Level 2 work we line up on Coast and Newcastle homes. If yours is on this list, the quote should name the accredited provider's part.
Before an old board comes off the wall, someone must cut the supply at the service fuse. That fuse is a network device, so pulling it and refitting it is Level 2 work, even when everything else on the day is ours.
Induction cooking, ducted air, a pool heat pump and an EV charger can push a house past what its supply was sized for. Increasing that supply, sometimes to three phase, means a Level 2 provider changes the service.
Taking the service line off the pole and running it in a trench removes a sagging wire over the driveway or a new second storey. The trench and conduit can be building work; connecting the cable is Level 2.
A new build needs a temporary builder's supply, a permanent disconnection of the old house where one stood, then a new connection energised before handover. Planning that from day one keeps the electrical fit-off on time.
A backyard flat usually runs from the main house on a sub-main, which is licensed electrician work. A separate connection or meter for the flat, or for a subdivided lot, brings in Level 2 work and Ausgrid's connection rules.
A branch through the line to the house, a leaning private pole on your land or a rusted bracket on the fascia all sit on the supply side. The NSW Government lists each of these as work only an ASP can carry out.
How it runs
Six steps, with one person on our side keeping the order straight.
Clarence looks at the board, meter panel, service fuse and how the line arrives, and notes whether the meter will need to change.
The accredited provider's portion sits on its own line, so you can see what the Level 2 visit costs and what our work costs.
We lock in a date with the provider and with you, and tell you in advance which hours the house will be without power.
The Level 2 worker removes the service fuse or disconnects at the connection point. Nothing on the board moves before that.
Clarence installs the new board or circuits and tests each one, then the provider reconnects and energises the supply.
Our compliance certificate is lodged within the legal deadline, and you get a clear note of what to ask your retailer for if a meter is due.
Each Certificate of Compliance for Electrical Work must reach Building Commission NSW no later than seven days after the circuits are tested, under the state's electrical compliance rules. For a fuller walk-through, read what happens on upgrade day.
Avoiding delays
Most stories of Level 2 jobs going sideways come down to the parties working out of order.
A cheap board price grows a second invoice once someone notices the service fuse has to come out. Check the accredited provider is included before comparing.
The board is finished but the house sits without power until the provider can return. We book both ends of the job for the same visit wherever the provider's schedule allows.
A retailer's metering provider may not fit a new meter until the board has a compliant service protection device. Sorting the board first avoids a wasted meter appointment.
A new deck roof, carport or upper floor can end up too close to the overhead line. Because Vincent plans the structure and Clarence the supply, the clash shows up on paper, not halfway through framing.
A few questions separate a genuine accredited provider from a trade that just uses the words.

He handled the electrical work efficiently, explained everything clearly, and made sure the site was left clean and safe.
Level 2 questions
Straight answers on accreditation, meters and who pays whom.
No. Clarence is a licensed electrician and does the work inside your installation. For anything on the supply side we engage an accredited Level 2 provider and coordinate their visit as part of your job, so you still have one point of contact.
Not in NSW. The service fuse, or service protection device, is treated as a network device, and work on it falls under Level 2 accreditation with authorisation from Ausgrid. A licensed electrician who is not accredited must wait for the provider to isolate the supply.
You do, as the property owner, because the work is for your connection. On our jobs the provider's charge appears as a separate line in the quote, so nothing about it is hidden inside a lump sum.
Ask for their ASP number, then search it on the NSW Government ASP platform, which lists providers by level and services. Each worker on site should also hold an authorisation from Ausgrid to work on its network.
Often not for the panels themselves. Solar usually needs a meter change through your retailer, and Level 2 work only comes in if the service or supply capacity has to change. Our solar electrician page covers the board side of going solar.
National rules that took effect in 2017 made retailers responsible for new and replacement meters, and any new meter for a home is a smart meter. Ausgrid still reads and maintains the older meters it installed until they are replaced.
Other electrical services
Level 2 work rarely arrives alone. These are the jobs it most often travels with, each with its own page.
Not sure which electrical service fits?Browse every electrical service
Start with a site check
Send a photo of your meter panel and a line about the job, whether it is a new board, an EV charger or a line going underground. Clarence will tell you which parts need an accredited provider and price the whole sequence.